Which projects belong in the wage review?
Start with the public-work contract list and identify the contracting authority, funding, location, clauses, and work dates. Include completed jobs with unresolved payroll questions as well as open work. Separate federal requirements from state or local rules before choosing the test.
The Department of Labor's Fact Sheet 66 describes Davis-Bacon and Related Acts coverage and core wage duties. It is a starting point for covered federal work, not proof that every publicly funded plumbing job uses the same requirements.
Use the selling hub to place the review beside the earnings and closing process. A seller can prepare a clear contract list without declaring that every project is covered or exempt. Qualified advisers should confirm the actual rule and evidence needed.
What is the payroll evidence trail?
A public-project payroll evidence trail links a covered contract and wage determination to the work performed, hours, pay, fringes, certified records, and job-cost ledger. It shows how the reported cost was tested. It does not certify a classification or establish a wage deficit.
Request the source payroll detail and relevant submissions through controlled access. Match worker identifiers consistently without placing private personnel records in a broadly shared buyer presentation. The decision file needs the evidence and review results, not unnecessary public disclosure.
Record the dates and version of each source. An amended submission or corrected ledger can change the result. Keep a short explanation of the change so the parties can trace the accepted amount to the original record.
Which wage determination applies to the work?
Find the determination and contract clauses used for the project. Ask qualified advisers to confirm the applicable location, work type, period, and any required changes. Do not select a rate simply because it appears beside the word “plumber” in a search result.
Compare the named work classes to actual field duties and time records. A worker may perform different tasks during a week. If the record is unclear, identify the specific gap instead of declaring that the whole crew was underpaid or correctly classified.
The new-construction sale guide helps connect the job review to the backlog. Keep payroll assumptions tied to the actual contracts. A margin forecast based on old costs may need review when the remaining work has different duties or requirements.
How do hours, wages, and fringes reconcile?
Trace the covered work from time records to payroll and job cost. Check the hours, class, cash pay, and supported fringe treatment. Ask how shared time, corrections, and benefits were assigned. A summary labor total cannot explain every worker-level entry.
Fact Sheet 66 explains that covered work involves the applicable prevailing wages and fringe benefits. Use the actual determination and qualified review for the target's figures. This guide does not supply a universal wage rate, benefit credit, or shortcut for valuing every plan.
Check the costs recorded in the financial statements against the payroll trail. Some entries may sit in another account or period. A supported correction should explain both the payroll evidence and the accounting entry rather than simply adding an estimated amount to job cost.
What do certified payroll records prove?
The Department of Labor's WH-347 instructions describe an optional form for required weekly information and a signed statement for covered work. Review the actual project submission process and responsible signer. Using that form alone does not establish that its entries are accurate.
Match the submitted record to payroll, hours, pay, and fringe support. Look for missing weeks, inconsistent identifiers, late corrections, or a statement that does not agree with the underlying records. Ask the responsible person to explain the discrepancy.
The seller document guide helps organize the records for buyer review. Keep certified submissions beside their source detail and any correction. A list of files received is useful without being a conclusion that the project's payroll passed review.
Which current federal limits matter?
Read the Department of Labor's current construction-contract page before relying on an older rule summary. Its notice describes a June 2024 preliminary injunction against specified provisions. The rest of the rule remains in force.
The affected provisions concern the supplier definition, certain on-site transportation-driver coverage, and incorporation by operation of law. Those limits make blanket statements about drivers or automatic clause coverage unreliable. Qualified advisers must review the actual work, contract, and current guidance.
Do not treat an older annual regulation PDF or a general resource page as the final word on these affected points. Record the guidance date and any unresolved issue. State and local prevailing-wage requirements still need their own review for the target's jobs.
What can a payroll reconciliation example show?
Consider an illustrative review, with no real worker or target data. Assume the job-cost ledger shows $40,000 of labor for a chosen period. The reviewer traces $32,000 of cash wages and $8,000 of recorded benefit costs to the same job and period.
Those entries total $40,000, so the arithmetic reconciles. That result does not prove that the wage determination, classification, hours, or benefit treatment is correct. Each needs its own evidence and qualified review under the actual requirements.
Now suppose $2,000 of the benefit entry cannot yet be traced to supporting records. Keep it as an unresolved evidence item. It is not automatically a $2,000 wage shortage or add-back; the advisers need to establish what occurred and how any supported correction enters the model.
Which fields make the review usable at closing?
Create one review row per project, with supporting payroll detail held under the agreed access controls. Record the tested periods and actual result. A project status should explain whether evidence was reviewed, a question remains, or a correction has been confirmed.
| Field | Evidence | Decision question |
|---|---|---|
| Covered project | Contract, clauses and funding | Which requirements apply? |
| Wage determination | Applicable project record | Which classes and terms need review? |
| Time and duty | Field records and payroll detail | What work did the person perform? |
| Pay and fringes | Payment and benefit support | What treatment is supported? |
| Certified record | Weekly information and statement | Does the submission match the source? |
| Deal treatment | Agreed model and legal duties | Who resolves and funds a confirmed item? |
Use the working-capital peg definition in the closing discussion with the CPA. Explain whether a supported amount is already recorded, unpaid, or a future cost. Keep it consistent with the chosen purchase definitions and earnings treatment.
Who handles corrections and ongoing submissions?
Assign a payroll owner, project contact, and adviser for each open issue. Identify who can explain the source records and who may submit a correction. Confirm the actual process with the recipient rather than assuming that the buyer can fix everything by changing a ledger entry.
Have counsel address the parties' duties for past and continuing work. A purchase agreement may allocate a claim while the project still needs payroll records and a response. The buyer also needs staff and systems to support future submissions for acquired jobs.
The sale process guide helps align that work with the timetable. Budget supported correction work and ongoing administration from actual facts. Avoid a universal compliance reserve that hides which projects, records, and duties remain uncertain.
What sequence supports a reliable margin decision?
- List public-work contracts and confirm the applicable federal, state, or local requirements.
- Match wage determinations and work classes to actual duties, hours, wages, and fringes.
- Reconcile certified records and source payroll to the job-cost ledger for the tested periods.
- Have qualified advisers resolve specific questions and explain any supported correction.
- Allocate closing duties and maintain the continuing payroll process for acquired work.
Keep the review's scope and limits with the result. A tested sample may support a focused conclusion without proving every project or period. Give the buyer a clear record of what was tested, what the evidence supports, and which questions still need an answer.